"We had previously used Busway Systems from all major suppliers from around the world, after using Vass who demonstrated detailed product knowledge and willingness to work us and importantly kept their promises – we will now not use anyone else."

Project Manager International Projects More Testimonials

Home >>  S-Series Busways at Work >>  S-Series Higher Education

Higher Education

The problem-solving power solution for higher education

Universities, colleges and other tertiary education organisations can't operate without safe, flexible and cost-effective electrical power distribution.



The Vass S-Series ELECTROBAR Busway Systems pass all these tests with flying colours. It's the academic choice over traditional cable systems.

Busway is faster to install and change

  • Your complete Busway Systems run can be installed overhead or underfloor in 30 - 40% less time than a standard cable design.
  • No searching through a myriad of cables. Repairs, upgrades and adding circuits are quick, easy and inexpensive.

It saves you time, money and space

  • Install more equipment and benches per square metre in means greater ROI now and with future upgrades.
  • No distribution boards in the rooms saves floor space and money.
  • If one area requires work, you don’t need to switch off power to the entire room.
  • You can start with a few lengths of Busway and add more as needed.
  • Keep track of electricity use and gauge future power needs with Power and Energy meters.

It's simple, versatile electrical power

  • Your own staff can add, change and move power source Take-Off-Boxes themselves without affecting anything else in the centre – so you eliminate expensive third party installation charges.
  • Plug-in outlets are available every 150mm, so you can move or add computers anywhere without the need for new power points to be installed.
  • Single and three phase power is available at every Plug-In point along the Busway.

It's a financial asset

  • If you move, the Busway system can come with you. So you avoid expensive cabling installations at your new premises.

It safer for your staff and students

  • Cutting down cabling use reduces risks and shows you are meeting OH&S requirements.
  • Busway runs protect power against water and mechanical damage often experienced with exposed cables and terminations.
  • Earth leakage is supplied at point of use (Take Of Box) providing unprecedented safety to staff and students.

It’s greener and cleaner

  • Far lower noise emissions, distortion and harmonics than cables
  • More efficient due to better air circulation and less overheating, dust and dirt build up
  • Up to 25% less copper and no PVC or environmentally harmful products used.


Like to know more?

Contact the Vass team today.
Learn more about the Vass S-Series Busway System